NYS Housing and Anti-Discrimination Notice Mobile: (631) 252-5301 Signature Premier Properties, 7 West Main Street, Smithtown, NY 11787, Office: (631) 360-2800
Jamie DelCore Licensed Real Estate Salesperson, Signature Premier Properties Signature Premier Properties

Guides and notes Smithtown

Smithtown Boat Slip: Town Wait List After the Fee Vote

November 5, 2026 · Jamie DelCore, Licensed Real Estate Salesperson

The Town Board's October 22, 2026 fee vote for Chapter 108 raised what a new berth or mooring costs, and it did not shorten the wait list. That split matters for anyone looking at Smithtown homes or Saint James homes who plans to keep a boat in Town waters: the permit gate is still residency or taxpayer status under the Town Code, not the closing date on the house.

On October 22, 2026 the Town Board adopted amendments to Chapter 108 fees, according to the public notice posted October 23, 2026. The notice PDF shows the new numbers: mooring permits at $225 a year, boat berths at a $1,710 minimum or $90 per linear foot, whichever is greater, and higher transient daily rates for residents and nonresidents. The fee vote does not shorten the wait list. It changes what a new permit costs once a space opens.

Who can get a Town slip or mooring

Section 108-3 states that it is unlawful to use a mooring space, a boat berth or a boat ramp without the appropriate permit from the Town Clerk, and that permits are granted only to residents and/or taxpayers of the Town of Smithtown. The same section says parties may contract and possess a mooring or a boat berth but not both simultaneously.

What that means for a buyer: a listing that mentions a nearby marina or a private dock is not a Town slip. Residence or taxpayer status is the gate, and it is checked by the Town Clerk, not by the seller. The timing is the part that decides the next step. The wait list application is available before closing, but a spot on the list still rests on being a resident or taxpayer when the Town processes the file.

The Town Clerk questions page answers "How can I get on the marina / mooring waiting list?" that the applicant is a Smithtown resident, and points back to the Boat Slips and Moorings page.

How the Permit Waitlist works

Section 108-4 has the Town Clerk compile applications in order of filing as the Permit Waitlist. A one-time fee of $25 accompanies each application. Only two residents per household or taxpayers per parcel of property of sixteen years of age or older may hold a spot on that list. The Town Clerk's page repeats the $25 fee as non-refundable, names the return address as the Town Clerk's Office, and says the boat slip and mooring wait list was updated August 26, 2026 for the 2027 boating season.

Section 108-5, added April 18, 2024 by Local Law No. 10-2024, says newly issued permits to first-time permit holders are issued for a total period of fifteen years.

For a seller who already holds a berth or mooring, the code text that once covered transfer of those permits was repealed on October 25, 2011. The article does not invent a transfer path. What carries the sale is stating clearly that a Town space is a personal permit, so a buyer who boats plans the wait list as a move-in task rather than as something that closes with the deed.

What the October 2026 fee vote changed

The adopted notice dated October 22, 2026 amends three fee sections:

  • §108-7 mooring permit fees: from $185 to $225 per year
  • §108-14 boat berth permit fees: from a $1,300 minimum or $65 per linear foot to a $1,710 minimum or $90 per linear foot, whichever is greater
  • §108-18 transient rentals: resident off-season day rate from $12 to $18, resident in-season from $1.50 to $3.00 per linear foot per day; nonresident off-season from $40 to $60 per day, in-season from $3.50 to $5.25 per linear foot per day

The Town Clerk's Boat Slips and Moorings page still said "Mooring Fee for 2027 is $185.00" when the notice was compared to the page. Cite the adopted notice for the Board's fee vote, and confirm the figure in force with the Town Clerk when a permit is offered.

Electricity fees at a berth in §108-14B ($200, $300 or $500 by amp service) were not rewritten in the October 22 notice. Boat ramp fees in §108-30 remain $45 a year for trailered boats and $7 a year for cartop boats on the code text, and the Town Clerk questions page still points boaters to the Clerk's office or the online purchase link for a ramp permit.

What a Smithtown buyer who boats checks first

Both of the Smithtown houses I have sold were built in the 1960s, one in 1963 and one in 1964. A move into that stock does not bring a Town berth or mooring with the keys. The practical check before an offer, when a boat is part of the plan, is whether the buyer will qualify as a Town resident or taxpayer in time to join the Permit Waitlist, and whether the household already holds a mooring or a berth that would block the other under §108-3.

Buyer consultation is the place to put that on the move-in list with the other Town paperwork.

A ramp sticker is a separate permit. The Town Clerk questions page says a canoe or kayak needs a ramp sticker, and §108-30 sets the cartop and trailered ramp fees. That path does not place a name on the marina wait list.

The one check before an offer

When a Smithtown or Saint James purchase is tied to keeping a boat in Town waters, the one check before the offer is this: confirm with the Town Clerk whether the buyer will meet the resident-or-taxpayer rule in §108-3, whether a household already holds a mooring or a berth, and what fee schedule the Clerk is collecting under the October 22, 2026 vote. A private dock on the parcel is a property question. A Town slip or mooring is a permit question, and the wait list is the path the code describes.

Questions about Smithtown

How does the Smithtown boat slip waiting list work?

The Town Clerk compiles applications in filing order as the Permit Waitlist under §108-4. A one-time $25 fee accompanies each application, and only two residents per household or taxpayers per parcel, age sixteen or older, may hold a spot. The Boat Slips and Moorings page said the list was updated August 26, 2026 for the 2027 season.

Where is the Smithtown mooring list?

The Town Clerk posts current mooring assignments and the mooring wait list as PDFs on the Boat Slips and Moorings page at smithtownny.gov. The page also posts boat slip assignments and the marina wait list. Those PDFs name permit holders; this guide cites the page, not the names.

Do I need a Smithtown boat ramp permit?

Yes, to use a Town boat ramp. Chapter 108 requires a ramp permit for trailered and cartop boats, and the Town Clerk questions page says a canoe or kayak needs a ramp sticker. Fees in §108-30 are $45 a year for trailered boats and $7 a year for cartop boats, purchased at the Town Clerk or online.

Who can get a Town of Smithtown slip or mooring?

Section 108-3 limits mooring, berth and ramp permits to residents and/or taxpayers of the Town of Smithtown. The Town Clerk questions page restates the wait list rule as requiring Smithtown residency. A party may hold a mooring or a berth, but not both at the same time.

What will a mooring or berth cost after the 2026 fee vote?

The October 22, 2026 adopted notice sets mooring permits at $225 a year and boat berths at a $1,710 minimum or $90 per linear foot, whichever is greater. The Town Clerk page still showed $185 for the 2027 mooring fee when compared; confirm the figure in force with the Clerk when a space is offered.

Can one household hold both a mooring and a slip?

No. Section 108-3 of the Town of Smithtown Code says parties may contract and possess a mooring or a boat berth but not both simultaneously. The wait list itself also caps spots at two residents per household or taxpayers per parcel, each sixteen years of age or older.

Sources

  1. https://www.smithtownny.gov/m/NewsFlash/Home/Detail/3492
  2. https://www.smithtownny.gov/DocumentCenter/View/9885/Amend-Chapter-108-Boat-Basin--Mooring-Re-Fees
  3. https://www.smithtownny.gov/288/Boat-Slips-Moorings
  4. https://ecode360.com/15097534
  5. https://www.smithtownny.gov/m/faq?cat=32

Get market updates from Jamie

Jamie will send occasional updates. You can stop them any time.

Privacy

Jamie DelCore Talk to Jamie