NYS Housing and Anti-Discrimination Notice Mobile: (631) 252-5301 Signature Premier Properties, 7 West Main Street, Smithtown, NY 11787, Office: (631) 360-2800
Jamie DelCore Licensed Real Estate Salesperson, Signature Premier Properties Signature Premier Properties

Guides and notes Smithtown

Smithtown Tree Removal Permit: The Chapter 285 Check at Sale

November 16, 2026 · Jamie DelCore, Licensed Real Estate Salesperson

A pre-listing cleanup and a buyer's pool or addition plan can both run into Town of Smithtown Chapter 285, but not for the same reason and not on every lot. For Smithtown homes, the first question is how the Town defines the parcel, not how many trunks stand in the yard.

How Chapter 285 defines the parcel

Chapter 285 is cited as the Tree Preservation and Land Clearing Law of the Town of Smithtown. It defines a tree as any living perennial, woody plant, its branches, its root system and its trunk, if greater than three inches in diameter measured three feet from ground level and six feet in height measured from ground level.

The definition that decides whether a permit is even on the table is "real property." For this chapter, that term includes all unimproved real property and improved property which is either subject to further subdivision within the zoning district in which it is located or, if nonresidential, is subject to an expansion or replacement of existing facilities that would cover a greater percentage of the lot.

Section 285-4 then makes it unlawful for an owner of real property, as defined in that section, to cause, permit or allow the removal, destruction or substantial alteration of the habit of any tree on any parcel of real property without first having obtained a permit. The same section, in 285-4 B, also makes it unlawful for any person to cut, damage, carve, dig or remove a tree, living or not, standing or downed, on public or private property, without the prior written consent of the owner. That consent has to be displayed on demand.

Section 285-5 then lists exemptions. The one that carries the weight for a typical house lot is 285-5 I: owners of a residentially zoned parcel of land which is not further subdividable, in accordance with the Zoning Code of the Town of Smithtown, shall not be required to obtain a permit pursuant to § 285-4 to remove trees located on their property. Separately, 285-5 H allows owners of residentially zoned real property, as defined in § 285-3, to remove, by hand-held tools or equipment only, a total of 10 trees located on the property upon which they reside, each year, for personal use, without a § 285-4 permit.

What this means at a sale is that the permit question is a parcel question. A residentially zoned lot that cannot be further subdivided is written out of the § 285-4 permit. A lot that can still be subdivided, or an unimproved parcel, stays on the permit path unless another 285-5 exemption applies. The owner's written consent in 285-4 B is a separate requirement, and it does not turn on that definition.

Worked example: four parcels, four Chapter 285 answers

  • A residentially zoned house lot that cannot be further subdivided: § 285-5 I says the owner does not need a § 285-4 permit to remove trees on that property. A contractor still needs the owner's prior written consent under 285-4 B.
  • A residentially zoned lot that is still subject to further subdivision: the parcel fits the chapter's definition of real property, so the § 285-4 permit path applies unless another exemption does, including the 10-tree, hand-held, personal-use allowance in 285-5 H.
  • An unimproved parcel: unimproved real property is included in the § 285-3 definition, so the permit path applies unless an exemption in § 285-5 applies.
  • A lot whose subdivision or site plan approval included a tree preservation and land clearing plan: § 285-5 G ties that plan to the approval, and § 285-10 says no certificate of occupancy shall be issued unless the Environmental Protection Director has determined that the approved plan, and the other provisions of the chapter, have been complied with.

When a permit is required: the fee, the hearing, and the certificate

When a permit is required, section 285-7, amended February 3, 2026 by Res. No. 2026-136, says each application shall be filed with the Town Clerk and be accompanied by an application fee of $200. The same resolution is printed in the Town's January 2026 public notice. The application has to include a plan clearly labeled "Tree Preservation and Land Clearing Plan," among other items in § 285-6.

The Town Clerk forwards the application to the Conservation Board, which holds a public hearing after notice in the official newspaper not less than 10 days prior to the hearing. Owners of land within a radius of 200 feet must be notified by certified mail. After the hearing, the Conservation Board reports its findings and recommendations to the Town Board, and the Town Board may direct issuance of the permit if it finds that the public interest will not suffer a significant adverse impact.

Section 285-10, last amended May 22, 2025 by Res. No. 2025-566, is the closing hook for a buyer who plans new work. No certificate of occupancy shall be issued by the Chief Building Inspector for any building, structure, premises lot or land unless the Environmental Protection Director has determined that the tree preservation and land clearing plan, as approved or subject to conditions, and all other provisions of this chapter have been complied with. That matters when an approved plan already exists, including after a subdivision or site plan approval under 285-5 G, or after a permit issued with a plan.

Penalties in § 285-11, also amended February 3, 2026 by Res. No. 2026-136, include a fine of not less than $500 nor more than $2,500 for each tree removed or destroyed in excess of those allowed, or imprisonment not exceeding 15 days, or both, plus possible restoration.

Chapter 285 on eCode360, the February 3, 2026 fee resolution, and the Town news cited below were checked November 16, 2026.

Open or expired building permits are a separate Town file, covered in Smithtown open permits.

Storm debris after the September 2026 nor'easter

The Town's nor'easter update, posted September 26, 2026, said Highway Department crews were responding to downed trees and clearing branches and debris from Town roadways. A later Town news item, posted October 27, 2026, said the Municipal Services Facility had been recycling fallen trees, branches and storm debris into natural, undyed mulch and was offering that mulch while supplies lasted, with no township restriction.

That cleanup still leaves the Chapter 285 question in place for trees on private lots, and it does not shift removal of a yard tree onto the Town. The Town's yard waste page states that residential and commercial tree removal, including tree stumps, will not be removed by Highway, and that the responsibility of removal is that of the homeowner or business owner.

Smithtown houses and older lots

The two Smithtown houses I have sold for sellers, in August 2021 and September 2026, were built in 1963 and 1964, and the median year built is 1964. Houses of that age sit on lots whose subdivision status and any approved tree plan are facts to confirm on the parcel, not assumptions from the year built.

Those sales are on my recently sold page.

The same Chapter 285 question for a seller and a buyer

For a seller doing a pre-listing cleanup, the useful first question is whether the parcel is a residentially zoned lot that cannot be further subdivided, and therefore sits under the 285-5 I exemption, and whether a contractor has the written owner consent that 285-4 B requires in any case.

For a buyer planning a pool or an addition, the useful first question is whether an approved tree preservation and land clearing plan already applies to the lot, because § 285-10 can hold the certificate of occupancy until the Environmental Protection Director confirms that plan was followed.

Help on the seller side: seller consultation.

Help on the buyer side: buyer consultation.

Questions about Smithtown

Does Smithtown require a tree removal permit?

Only on parcels Chapter 285 defines as real property, unless an exemption in § 285-5 applies. Section 285-3 limits that term to unimproved parcels and to improved parcels that can still be subdivided, or nonresidential parcels that can be expanded. Section 285-5 I then says the owner of a residentially zoned parcel that is not further subdividable does not need a § 285-4 permit to remove trees on that property.

Is a permit required to cut down a tree in a Smithtown yard?

In the Town of Smithtown, that depends on the parcel. If the yard is a residentially zoned lot that cannot be further subdivided, § 285-5 I says no § 285-4 permit is required to remove trees on that property. If the lot can still be subdivided, or is unimproved, the permit path applies unless another 285-5 exemption applies. Written owner consent is still required under 285-4 B.

How much is a permit to cut down a tree in Smithtown?

When a Chapter 285 permit is required, § 285-7, amended February 3, 2026 by Res. No. 2026-136, sets the application fee at $200, filed with the Town Clerk. The same resolution set the § 285-11 penalty range at not less than $500 nor more than $2,500 for each tree removed or destroyed in excess of those allowed. Exempt lots under § 285-5 I do not pay that fee.

What tree work is exempt from a Smithtown permit?

Section 285-5 I exempts owners of a residentially zoned parcel that is not further subdividable from the § 285-4 permit for trees on that property. Section 285-5 H allows owners of residentially zoned real property, as defined in § 285-3, to remove up to 10 trees a year for personal use with hand-held tools only, on the property where they reside.

Can tree work hold up a certificate of occupancy in Smithtown?

Yes, when an approved tree preservation and land clearing plan applies. Section 285-10, amended May 22, 2025 by Res. No. 2025-566, says no certificate of occupancy shall be issued unless the Environmental Protection Director has determined that the approved plan, and the other provisions of Chapter 285, have been complied with. That is the hook for a buyer planning a pool or addition on such a lot.

What happens to storm debris and downed trees in Smithtown?

The Town's September 26, 2026 nor'easter update said Highway crews were clearing downed trees and branches from Town roadways. The October 27, 2026 Town news item said the Municipal Services Facility had turned fallen trees, branches and storm debris into natural, undyed mulch and was offering that mulch while supplies lasted. The Town's yard waste page says Highway will not remove residential or commercial tree removal, including stumps.

Sources

  1. https://ecode360.com/15103136
  2. https://www.smithtownny.gov/DocumentCenter/View/9100/Chapter-285-Trees-PDF
  3. https://www.smithtownny.gov/m/NewsFlash/Home/Detail/3499
  4. https://www.smithtownny.gov/m/NewsFlash/Home/Detail/3477
  5. https://www.smithtownny.gov/699/Yard-Waste

Get market updates from Jamie

Jamie will send occasional updates. You can stop them any time.

Privacy

Jamie DelCore Talk to Jamie